2013 Ker 46
Specifications
Equipment & Extras
- Rig
- Sloop
- Keel
- Fin Keel
- Name
- Daguet 3
- Class
- Performance Sail
- Berths
- 8
- Layout
- Aft Cockpit
- IRC TCC
- 1.287 (2024)
- ISO OSR
- CAT. 1
- Engine HP
- 38 hp
- Boat EPIRB
- 2
- Life Rafts
- 2 x Ocean Safety light carbon
- Ancasta Ref
- 47643
- Engine Make
- NANI
- Engine Year
- 2023 (new)
- Pit Winches
- 1 x Harken 50.2
- Construction
- McConaghy Boats
- Engine Model
- N4.38
- Life Jackets
- 13 x Spinlock deckvest equipped with AIS automatic Ocean safety
- Engine Battery
- 1 x Lithium
- ISO Structural
- CAT. A
- Personal EPIRB
- 13
- House Batteries
- 2 x Lithium
- Naval Architect
- Ker Yacht Design
- Primary Winches
- 2 x Harken 65.3 STR UD (driven)
- Backstay Winches
- 2 x Harken 50.2ST
- Displacement IRC
- 6278 Kg
- Fuel Tank Capacity
- 52L
- Main Sheet Winches
- 2 x Harken 65.3 STR
- Hull & Deck Construction
- Full carbon construction with vacuum consolidated carbon/foam sandwich throughout, with unidirectional fibre reinforcement.
- Harken MX pedestal mounted aft of traveller
- ‘Pro-Trim’ traveller system
- Spinlock clutches
- Custom organizers
- Composite aerofoil stanchions, pushpit & pulpit
- Stainless steel 1/19 wire lifelines
- 8 x clear dinghy hatches in cockpit sides for rope stowage
- Sliding fore hatch with inflatable seal
- String drop system lead to main winch
- McConaghy carbon fibre winch handle pockets
- Foredeck toe rails to ORC standard
- Retractable propulsion unit with fixed five blade propeller
- Spinlock flush throttle control
- Category OSR2 full equipped
- Auto pilot mounting bracket
- Prisms above head and nav station for extra light
- Mainsheet trimmer console and purchase system for main cunningham, outhaul, jib tack & traveller
- Electric auto/manual bilge pump system (6 Additional Bilge Pumps)
- Soft padeyes instead of folding pad eyes where ever possible
- Wheel steering package (2 wheels)
- Adjustable helm platforms
- Foot button controls for pedestal
- 3 x Unreelers for spinnaker sheet and spinnaker halyard tidy up
- Foredeck hatch has pneumatic seal operational from mast bracket and below deck
- Custom carbon roller at foredeck hatch for spinnaker string drops
- Internal bocks for spinnaker string drop system
- Mast gate customized to rectangular shape to allow shims
- Adjustable mast step with built in mast jack, pump mounted on bulkhead in the head
- Full boat cover (deck and cockpit)
- Boom and mast cover
- Cockpit work covers
- Spare Bowsprit
- Spare Rudder
- Spare Wheel x2
- Spare Gorilla head foil
- Spare Pushpit and pullpit and stanchions
- A lot of spare winch parts
- Spare Inflatable hatch seal
- Spare EC6 runner x2
- Spare Full mast head unit
- Boat cradle high and low positions (storage and shipping)
- Keel cradle
- Red/white cabin lighting in saloon, galley, head and navigation areas
- 12-volt DC switch panel battery isolator/selection switch
- Navigation lights pulpit, pushpit mounted
- Offshore door fitted for water tightness (2019)
- Mast repainted Alw Grip Black (2021)
- John buoy and Dan buoy fitted on central pushpit (2021)
- Customized kitchen/galley area (new 2021)
- New rudder designed by KER and made by HEOLE Composite (2021)
- New Bulb (2021 machined by Fonderie LEMER, 2021)
- New rudder bearing JP3 (2022)
- New Mast jack pump (2022)
- New bowsprit made by HEOLE Composite (2023)
- Load cell on spinnaker tack by Diverse (2023)
- Non skid foam SEADEK inside boat (2023)
- Fuel tank and pipes (2023)
- Main computer (2021)
- Tablet (2023)
- Starlink antenna (2024)
- All V Blocks from Harken (Main sail, runners, Sheets)
- Running rigging (replaced each year)
- All sails from North Sails, using a mix of Australian and French sail lofts
- Mainsails: MN-1 June 20 (Offshore), MN- October 21 (Delivery), MN-2 March 22 (Offshore), MN-3 June 24 (Inshore)
- JIB #1: J1-1 June 20, J1-2 March 22, J1-3 June 24
- JIB #2: J2-1 June 20, J2-2 March 22, J2-3 June 24
- JIB #3: J3-1 February 21, J3-2 October 23
- JIB #4: J4-1 February 21
- JIBTOP: FJTP-1 January 23
- GSS: GSS-2 March 22, GSS-3 January 24
- Downwind A #1: A1-1 June 20, A1-2 September 22, A1.5-1 October 22, A1.5-2 January 24
- Downwind A #2: A2-2 August 20, A2-3 June 24, A2-4 January 24
- Downwind A #4: A4-1 February 21, A4-2 August 22
- Downwind A #5: A5-1 February 21
- CODE: C0-1 June 20, C0-2 January 23
- WS: WS-1 October 21, J05-1 October 23
- SS Spinnaker Staysail: 2016
Description
Change History
3 events trackedPrice dropped by £77,000 (14.0%)
via Ancasta
Location changed from | Marseille France to Marseille France
via Ancasta
New listing appeared
via Ancasta
Financing Calculator
Financing Calculator
Estimate the true monthly cost of owning the 2013 Ker 46.
Monthly Running Costs (estimated)
Can I afford this?
These are estimates for illustration only. Actual rates, terms, and running costs will vary. Always seek independent financial advice before committing to marine finance.
Looking for marine finance? We are working with finance partners to offer quotes directly. Check back soon.
At ~£4,647/mo, is this boat priced right?
Get the full deal report →Transport Cost Estimator
Transport Estimate
Estimate the cost of transporting the 2013 Ker 46 to your marina.
Select your destination above to see transport estimates.
Indicative estimate only. Actual costs may vary. Road distances are approximated. Crane lift and haulage costs depend on boat weight, beam, and access. Always obtain quotes from specialist boat transport companies before committing.
Before you commit, get the full picture on this boat.
Get the Pre-Purchase Report →Is this boat a good deal?
Get the full price history, market comparison, and red flags, before you commit.
Full intelligence on a 6-figure purchase, for less than filling your fuel tank to go see it.
Get alerted if the price drops
Create a free account to track this boat and get notified when the price changes, new photos are added, or the listing is updated.
Sign up free to track this boatNo credit card required
Negotiation Tracker
Sign up for Pro to track offers, get market intelligence, and compare boats.
See Pro Features